Skip to content
Call
Free tool

Playground Inspection Schedule Planner

How often to check, and how many staff hours that takes.

Inspection Schedule PlannerFree toolInspection Schedule Planner
How busy is it?
Climate
Surfacing
0quick visual checks a year
0detailed checks a year
0surface checks a year
0staff hours a year, about

The rules

How the rhythm is worked out

Busier playgrounds need more checks: light use 26 quick visual checks and 2 detailed checks a year, steady use 52 quick visual checks and 4 detailed checks a year, heavy use 104 quick visual checks and 6 detailed checks a year. A hard climate adds a detailed check, and surfacing adds checks of depth or firmness (4 a year for rubber or tile and 12 for loose fill). Staff hours add 10 minutes plus 3 for each structure per quick check, 40 plus 10 per detailed check and 20 per surface check.

Questions

About the inspection schedule planner

Is this a rule I must follow?

No. It is a planning rhythm. Your insurer, your city or the manufacturer may require more, and a trained inspector can set a schedule for your site.

What is in a detailed check?

Hardware, moving parts, structure, surfacing and use zones, with notes and photos.

Want a pro to check the numbers?

Call or send the form for a free estimate. A real person answers.

Free estimate

Tell us about your play area

Tell us who the playground is for and where it will be: a school, a park, a daycare, a neighborhood or a business. A real person will reply with a clear next step and a visit time.

Prefer to talk? Call(800) 224-9245
  • Free written estimates with drawings and an equipment list
  • Equipment, surfacing, shade, installation, inspections and repairs
  • Planning around your calendar, and a walkthrough with you when we finish

Get a free estimate

We only use your details to answer your message and set up your estimate.