Playground Install Timeline Planner
A working-day figure for equipment, surfacing and site.
Free toolInstall Timeline PlannerHow the schedule is worked out
Each size of project has a base of working days of equipment work (one small structure 3, a medium play area 6, a large play area 10, a campus or park 18). Surfacing adds days (loose fill 1, rubber tile 3, synthetic turf 4, poured rubber 5), and the total is multiplied by a site factor (flat and dry 100 percent, some slope or wet spots 115 percent, steep, rocky or tight 140 percent). Poured rubber adds 3 days for curing that are not scaled.
About the install timeline planner
Does weather change this?
Yes. Rain can pause concrete and rubber work, so exterior schedules should have a buffer.
Can the work be done over a school break?
Often yes. Most school projects are scheduled for breaks and planned backward from the opening date.
When you are ready for a pro
Design and care 04Playground InstallationProfessional installation from footings to final check
Design and care 05Project Management and Permit SupportOne point of contact from first call to final walkthrough
Surfacing 06Playground Site Grading and ExcavationThe groundwork that makes everything else lastNo service matches that search. Try a shorter word.
Call or send the form for a free estimate. A real person answers.