Playground Install Timeline Planner

A working-day figure for equipment, surfacing and site.

Install Timeline PlannerFree toolInstall Timeline Planner
Size of the project
Surfacing
The site
0working days
0weeks of five-day weeks

The rules

How the schedule is worked out

Each size of project has a base of working days of equipment work (one small structure 3, a medium play area 6, a large play area 10, a campus or park 18). Surfacing adds days (loose fill 1, rubber tile 3, synthetic turf 4, poured rubber 5), and the total is multiplied by a site factor (flat and dry 100 percent, some slope or wet spots 115 percent, steep, rocky or tight 140 percent). Poured rubber adds 3 days for curing that are not scaled.

Questions

About the install timeline planner

Does weather change this?

Yes. Rain can pause concrete and rubber work, so exterior schedules should have a buffer.

Can the work be done over a school break?

Often yes. Most school projects are scheduled for breaks and planned backward from the opening date.

Want a pro to check the numbers?

Call or send the form for a free estimate. A real person answers.

Free estimate

Tell us about your play area

Tell us who the playground is for and where it will be: a school, a park, a daycare, a neighborhood or a business. A real person will reply with a clear next step and a visit time.

Prefer to talk? Call(800) 224-9245
  • Free written estimates with drawings and an equipment list
  • Equipment, surfacing, shade, installation, inspections and repairs
  • Planning around your calendar, and a walkthrough with you when we finish

Get a free estimate

We only use your details to answer your message and set up your estimate.